Month: February 2012

Project Requests 02/2012: Hydraulic block machine design and shapes

PROJECT: Hydralic block machine design design for shapes for characteristic block machine: Not informed by the applicant COMPANY [Only available to N1 subscribers] : LOCATION: Not informed by the applicant CONTACT [Only available to N1 subscribers] : For questions and further details about the project use the "Your Comment" field at the bottom of this page! […]

Project Requests 02/2012: Methane gas capture project

PROJECT: Methane Gas Capture FEATURES: I need a design for a unit that captures methane gas from a biodigester, filters it and stores it to be used in a generator engine ( daily gas production capacity of the biodigester is 4000 m3), budget at least 5 different points of capture COMPANY [Available […]

Project Requests 02/2012: Garbage Compactor Truck Project

PROJECT: Garbage Compactor Truck Project FEATURES: Not informed by the applicant COMPANY [Only available to N1 subscribers] : LOCATION: Not informed by the applicant CONTACT [Only available to N1 subscribers] : For questions and further details about the project use the "Your Comment" field at the bottom of this page! Questions or information will not be answered via […]

Embraer and Fatec open registration for designer program

The Faculty of Technology (Fatec) from São José dos Campos, in partnership with Embraer, Registration is open until Monday (13) for the selection process, which will select 40 newly trained technicians for the Embraer Designers Program (PPE). Registrations must be made through the site www.embraer.com.br/ppe. The goal is to empower professionals so that […]

Scroll to top