Month: September 2019

Project Requested - Special Portable Chair |End Day 05 out 19|

FP Project Request
I'm looking for a partner/company that produces a folding chair, portable in tubular steel or similar static paint , the company only needs to do the hardware part. If you can't do it …

Requested Project - Electric rural vehicle |End Day 25 set 19|

FP Project Request
Hello, we need a project for an electrically powered rural vehicle, and batteries.

the idea is equipment that is like a mini tractor, but electric.

N2 Calculation Spreadsheets: Control Valve Curve Calculation (N-1882)

Worksheet N2: The Process Engineer by defining the static process differential pressures upstream and downstream of the valve and the dynamic process differential pressures( in the valve in operation) upstream and downstream of …

Requested Project - Concrete aggregate batcher project |End Day 30 set 19|

FP Project Request. Set of Silos for DA Aggregates; Aggregate dosing system for concrete consisting of three silos of five cubic meters each and a dump conveyor to move the aggregates directly into the concrete mixer. Three aggregate silos with 5m³ each….